Skip to content
951-348-8779 Free estimate
Remodeled bathroom with a tiled shower and vanity

Bathroom remodelsdone right behind the tile.

Showers, tubs, vanities, tile and glass, whether you need a full gut or a simple refresh. Mike handles the job from the first walkthrough to the final inspection.

Bathroom remodeling

What the job involves

A bathroom is a small room with a lot packed into it: water supply, drains, venting, waterproofing, tile, glass, lighting and an exhaust fan, all within a few feet of each other. Getting the parts you cannot see right is what keeps a shower from leaking into the wall a few years from now.

Some bathrooms need a full gut: tub out, walls opened to the studs, new valve, new pan, new tile. Others just need a refresh, such as a new vanity, counter, mirror, lighting and paint, with the existing shower left alone. Mike Orona looks at what you have on the first walkthrough and tells you plainly which one your bathroom needs.

Common projects include tub-to-shower conversions, walk-in showers with frameless glass, tiled tub surrounds, a double vanity in place of a single, and better lighting and ventilation. Mike handles the job himself from walkthrough to final inspection, and the electrical for new lights, outlets and fans is done in-house as part of the remodel.

Work that needs a permit is permitted through the city or county building department and inspected. We remodel bathrooms in Murrieta, Temecula, Menifee and nearby, and estimates are free.

Frameless glass walk-in shower with tiled walls and a pebble floor

The work, up close

Frameless glass walk-in shower with tiled walls and a pebble floor
Walk-in shower
Tiled tub and shower with green tile
Tub and shower
Glass sliding shower beside an oak vanity
Shower conversion
Remodeled bathroom with vanity and glass shower
Vanity and glass
Bathroom after remodel
Finished bathroom

What's included

  • Walkthrough and a written scope
  • Demolition to the studs or a partial tear-out
  • Tub-to-shower conversions and new tubs
  • Shower valves, drains and supply lines
  • Waterproofing behind tile and in shower pans
  • Wall and floor tile, niches and benches
  • Vanities, counters, sinks and faucets
  • Lighting, outlets and exhaust fans
  • Glass enclosures, mirrors and accessories
Tiled tub and shower with green tile

Pricing

What affects the cost

Every job is priced after Mike sees it. These are the things that move the number.

  1. 01

    Full gut or refresh

    Opening walls to the studs means new plumbing, waterproofing, drywall and tile. Keeping the shower and replacing the vanity, lighting and fixtures is a much smaller job.

  2. 02

    Shower size and layout

    A walk-in or curbless shower, a bench, niches and a bigger footprint add framing, waterproofing and tile work. Moving the drain or the toilet means opening the floor.

  3. 03

    Tile and pattern

    Large-format tile, small mosaics, pebble floors and patterns like herringbone take longer to lay than a straight set. How far up the wall the tile runs matters too.

  4. 04

    Glass

    A curtain rod, a framed door, a sliding panel and a fully frameless enclosure are very different line items. Glass is measured after the tile is finished, so it is usually one of the last pieces in.

  5. 05

    Ventilation and electrical

    Many older bathrooms have a weak fan or none at all, and too few outlets near the vanity. Adding a fan that vents outside, new lighting or a dedicated circuit is worth doing while the walls are open.

  6. 06

    Hidden damage

    Rot under a toilet, a slow leak behind tile or a failed shower pan is common once demo starts. Mike shows you what he finds and prices the repair before going further.

How the job runs

The full process
  1. 01

    Walkthrough and plan

    Mike walks the job with you, measures, and writes a scope and a price you can hold him to.

  2. 02

    Demo and rough-in

    The old comes out. Plumbing and electrical go where the new layout needs them.

  3. 03

    Build and finish

    Framing, drywall, cabinets, counters, tile, paint and lighting, in order.

  4. 04

    Final inspection

    Permits closed, everything tested and adjusted. You walk it with Mike.

Questions people ask

Should I convert my tub to a shower?

If nobody in the house uses the tub, a walk-in shower often makes the room easier and safer to use. If it is the only tub in the house, think about whether you, or a future buyer with young kids, may want one. Mike can talk through both options at the walkthrough.

What is the difference between a refresh and a full remodel?

A refresh replaces what you can see: vanity, counter, faucet, mirror, light fixtures, paint and sometimes the floor. A full remodel opens the walls and floor so the plumbing, waterproofing and layout can change.

How do you keep a tiled shower from leaking?

The tile itself is not the waterproof layer. What keeps water out of the wall is the membrane or pan behind it, how the drain is tied in, and how corners, niches and seams are treated. On permitted work, that layer is inspected before it is covered.

Can I use the bathroom during the remodel?

Plan on that bathroom being out of service once demolition starts. If it is the only one in the house, tell Mike at the walkthrough so the order of work can be planned around it.

Can I get frameless glass?

Yes. Frameless, framed and sliding enclosures are all options, and each suits a different shower size and budget. The glass is measured once the tile is done, so it fits the finished opening exactly.

Will the bathroom need inspections?

When the work requires a permit, yes. Inspections typically happen at rough-in, before the walls are closed, and again at the end. Mike schedules them as part of the job.

Often done together

Service areas

Murrieta, Temecula, Menifee and surrounding areas

Get a freeestimate.

Four quick questions. Mike reads every one himself and calls you back, usually the same day.

  • Free, no obligation
  • You talk to the owner, not a call center
  • Licensed, bonded and insured. CSLB #1160821

Rather talk now? Call 951-348-8779
Open 24/7, including emergencies

What are you planning?
Where's the project?
When would you like to start?
Where should Mike reach you?
Add a note for Mike (optional)
Thanks. Mike has your details.

He'll call you to set up a walkthrough, usually the same day. If it's urgent, call 951-348-8779 now. Photos help: you can text them to the same number.